First high speed train on Delhi-Agra section soonIllustrative image – not actual.

The first high speed train between Delhi and Agra, with a speed of 160 kmph, is expected to run on 10 November, 2014.


The Kapurthala Rail Coach Factory (RCF) is all set to roll out the first rake of fourteen coaches of the train. The RCF has manufactured four coaches of the high speed train so far and work is going on to manufacture the remaining ten coaches by 10 November, to turn out the first rake.


The approx cost of one high speed coach is between Rs 2.25-2.50 crore.


The railway board and officials of the railway department have already conducted a trial run of these coaches on the Delhi-Agra section, at a speed of 160 kmph and covered the 200 km distance in 99 minutes a few days ago.


Initially, the speed of these trains will be 160 km on select rail routes and gradually it will be enhanced upto 200 km after upgrading the signalling system and barricading the area.


A high speed coach, capable of running at 200 kmph, will be rolled out by June next year.

← All latest storiesBack to top →