Illustrative image – not actual.On 20 February 2014, Uddhav Thackeray, President of Shiv Sena, inaugurated Phase-II of the Maroshi-Ruparel College underground water tunnel project in Mumbai.
Phase-II of the tunnel project is 6.4 km long and stretches from Vakola to Ruparel College.
The Maroshi to Ruparel College underground water tunnel project, having a total length of 12.24 km, and 3.6 mtr wide, with a depth of 70 mtr has been undertaken by Municipal Corporation of Greater Mumbai (MCGM) under the JNNURM scheme.
The water supply project which commenced in September 2007, has been aimed at improving the water supply in areas of H / East, K / East wards, some part of H / West ward in G / South, G / North, South-West wards as well as in the water supply from the Malabar Hill reservoir.
In May 2013, Phase-I of the project, stretching from Maroshi to Vakola, having a length of 5.83 km, was inaugurated.
The water supply project is divided into three sections - Maroshi to Vakola, Vakola to Mahim, and Mahim to Ruparel. Shafts, connected with the zonal supply network will connect the tunnels at Maroshi, Vakola, Mahim and Ruparel.
The tunnel will carry about 700 million ltr of water per day.
Related Link:
Project profile
